The complete renovation of the existing 4,160 square feet Occupational Therapy / Physical Therapy (OT / PT) spaces at the John D. Dingell V.A. Medical Center includes the removal and demolition of existing and rarely used hydrotherapy tubs and underutilized spaces to open up needed space for new equipment, treatment and office space, as well as the removal of all existing flooring, ceiling, finishes, and lighting. The newly renovated space will welcome veterans through a new centralized entrance, and it will provide better privacy for veterans as they meet with doctors and therapists in the newly added treatment spaces. New offices and storage rooms will provide better use of the overall space, and the finishes will bring new life to the space with bright and exciting colors. With the new spatial layout, all existing mechanical, electrical, plumbing, medical gas, and fire protection systems will be modified and rerouted.
• Detroit, Michigan
• 4,160 Square Feet Renovation
• New Finishes
• Modified Mechanical, Electricl, Plumbing, & Fire
Protection Systems