The removal of Building 12 at the V.A. Northern Indiana Health Care System Marion Campus includes asbestos abatement, lead-based paint abatement, and utility disconnect / relocation. Additional work includes excavation and backfill, redesign of the existing parking lot west of the building, and incorporation of a new parking lot. Site remediation for lawns and pavement will be incorporated, along with phasing and traffic control. Two gas boilers and two heat pumps will be removed from the building and returned to the V.A. Electrical work includes removing and reconnecting the building management system and emergency power B-114. The geothermal work includes capping of the geothermal field.
• Marion, Indiana
• Asbestos & Lead-Based Paint Abatement
• Utility Disconnect & Relocation
• Excavation & Backfill
• Redesign of Parking Lot & New Parking Lot
• Capping of Geothermal Field